top of page

BIRMINGHAM,AL

SOUTHLAND TUBE EXPANSION

This design/build collaboration between Designform and Brasfield & Gorrie consisted of a 16,284-square-foot, two-story office addition to the current Southland Tube campus. The structure is designed as conventional steel-framed with a brick exterior to match and complement the existing buildings. The expansion of this space allows room for a total of eleven offices, three toilet rooms, a break room, and a state-of-the-art multi-purpose area designed for meetings and training events.

 

Designform provided both architectural and interior design services for this project including furnishings selection and construction contract administration.

LOCATION

1500 Urban Center Drive

Suite, 220 

Vestavia Hills, AL 35242

CONTACT

205.324.0018

SOCIAL MEDIA

  • Facebook - White Circle
  • Instagram - White Circle
  • LinkedIn - White Circle

Join our mailing list

Never miss an update

bottom of page